Barnstable Bulkhead Project

<< Back

A portion of the wooden bulkhead failed in March 2008 leading to costly temporary emergency repairs and possible collateral damager to the adjacent steel bulkhead. To reduce the cost of the emergency repairs the temporary repairs were only designed to last for 18 months until full replacement could be completed. The existing steel bulkhead is showing signs of deterioration including: movement of the steel sheeting, failed/failing wales, and loss of soil material from behind the bulkhead as evidenced by subsidence in the parking lot. The loss of material from behind the bulkhead is causing shoaling under and around the adjacent floats and slips. According to town engineering assessments, the best solution to prevent further deterioration is to replace the entire bulkhead estimated to cost $5,000,000.

The Town of Barnstable has applied for and been awarded a Commonwealth of Massachusetts Executive Office of Administration and Finance (EOAF) grant in the amount of 75% of the project up to $3,750,000. EOAF agrees to provide financial assistance to the Town for replacement of the bulkhead and paved area with funds authorized under Chapter 312 of the Acts of 2008.

Barnstable Inner Harbor is one of the busiest harbors on the Bay side of Cape Cod. It provides space to over 502 commercial and recreational vessels and other marine-related activities including a 392-passenger whale-watching vessel. The harbor employs 189 people in a variety of professions, both full and part time, and generates an estimated 8 million dollars in economic activity.

We believe that the tremendous community support this project received pushed it to the top of Governor Deval Patrick’s long list of infrastructure needs. Councilor Ann Canedy, Senators Rob O’Leary and Therese Murray, Representative Demetrius Atsalis as well as the Friends of Barnstable Harbor were critical proponents of this project.

The Town of Barnstable has hired CRC Co., Inc. to do the work which should commence in early April. Working with Vine Associates, Inc. and the Town, CRC’s work is expected to take approximately 270 days to complete. Updates on the project may be found on this webpage.
 


<< Back

Contact

DPW Admin
Daniel W. Santos, P.E.
P 508-790-6400
F 508-790-6406
8:30a.m. to 4:30p.m.
382 Falmouth Road
Hyannis, MA. 02601


Public Records
Ann Quirk
Public Records Request
P 508-790-6400
382 Falmouth Road
Hyannis, MA. 02601

 

 

Public Works
News & Updates
  • n/a


   
   

Owned and Operated by The Town of Barnstable - Information Technology
 

Home | Departments & Services | Boards & Committees | Residents & Visitors | Doing Business | Town Calendar | Phone Directory | EmploymentEmail Town Hall